STATEMENT OF PROBLEM
One of the biggest problems associated with most of the construction projects in Nigeria today is problem of delays and disruptions at both the pre-contract and post-contract stages of construction in building and civil engineering works.
The cost of building increases at the cause of delays and disruption in construction because of variation. many construction project in Enugu needed huge capital outlay and time to execute them and any attempt to delaying and disrupting the construction proper will result to terrible consequences that will affect the economical control and building cost.
1.3 PURPOSE OF THE STUDY
The purpose of this study is as follows –
ABSTRACT
This had been an attempt to investigate the attitude of mother-in-law towards daughter-in-law as a determinant...
ABSTRACT
The study examined the psychosocial effect of the institutionalization of orphans and...
Background to the study
The effect of health on worker‘s productivity suggests a relationship bet...
Introduction
Science and technical education are foundations for sustainable national development as they protect human...
ABSTRACT
The study examines the effect of polygamy and large family size on students’ academic performance in sele...
ABSTRACT
The study examined the Management of Resources in FCT Government Secondary Schools Abuja, Nigeria. The objectives of the study a...
Background to the Study
The issues of poor academic performance of student in Nigeria have been of much...
ABSTRACT
The 1975 ECOWAS Treaty made by the founding fathers of the West African Regional Integration Philosophy was revised in 1993 in v...
Background of the <...
ABSTRACT
This study was on the determination of optimum packaging and storage properties of packaged ga...